oh boy, it's been three weeks since my initial video, two weeks since i finished the cabinets and stripped the wallpaper, and a week since i finished grouting. now, i am closer than ever to finishing my list!
rundown of updates:
7/1 - tear down wallpaper - CHECK! except it wasn't quite as easy as i showed in the video, we pulled some extra layers off in places, so some mudding/sanding will have to be done [so i will add that to the list]
- mud/sand walls - CHECK! mike did an amazing job!!!
- repaint walls - CHECK! we decided to go with a bit darker color "traditional" than originally chosen so it wouldn't clash with the window or tiling
7/1 - repaint cabinet and drawers under sink - CHECK! eurolinen by behr
7/1 - new hardware for cabinets, drawers, etc. - CHECK! brushed nickel pieces
7/1 - clean and line all the drawers - CHECK! plus i cleaned all the junk out of the drawers
7/1 - repaint radiator - CHECK! informal ivory, like the rest of the house
- re-grout tiling around the room - CHECK! finished the tub last week!
- re-caulk the bathtub
- new light fixture above the sink - CHECK! another thank you to mike!
- make and install curtain for window
so, as you can see, all i need to do is caulk the line of the tile and paint around the room as well as have mike help me make a curtain for the room.
went with "traditional" |
all mudded and sanded |
primed |
last remaining wallpaper in the house - the bathroom ceiling. i think we'll keep it |
new paint drying |
getting ready for the light fixture |
lovely and sophisticated |
and new bath mats! |